Boulder Creek
Client: BC Hydro
To supply and place 1200 tonnes of riprap to raise the bottom invert of the creek to ensure the water would be supplied to a diversion pipe.
Seymour River Bank Protection Works
Client: Squamish Nation
Construction of approximately 4,200 m3 of riprap bank protection, bendway spurs, biotechnical riparian enhancement, riparian restoration, and in-stream works.
North Creek Stormwater Diversion
Client: The Township of Langley
Installation of twin 1350mm steel drainage culverts, construct lock-block headwalls, channel and ditch re-grading, re-locate an existing gas main, local fill and grading, and supply and installation of a short section of 450mm storm sewer.
Byrne Creek -
17th Avenue Headwall
Client: City of Burnaby
The construction of a headwall and associated works for the upstream end of the culvert that conveys Byrne Creek under 17th Avenue in the City of Burnaby.